Project Description:
This is an LPG gas processing plant project. The site is powered by two gas generators, two generators will switch one time every day, and it will take 10-30 minutes during the switch. During the switching period, important loads cannot be powered off, how to do it? That’s right, it uses battery energy storage. SCU has provided an all-in-one solution for Indonesian customers
Requirement:
-Pure off-grid
-Switching of two 350kW gas generator to power the plant load
-30kWp photovoltaic panels, the photovoltaics only charge the batteries
-Load: 350kW, customer requests a 100kW key load to ensure uninterrupted power supply when two gas generators are switched.
-Backup time: DG replaced need 10-30 minutes one time, 1-2time per day
SCU off-grid solution:
-Model: GRES-150-100
-2*75kWH Lithium battery with a total of 150kWH, which can be used for full day when fully charged
-3*50kW PCS, because it is full output when DG replacing, it is not recommended that the PCS 100% output for a long time, add an additional 50kW ACDC module, so that the PCS is stable at 70% output protection module),
-1*50kW MPPT module connected to 30kWp photovoltaic panel
-IP54 for outdoor usage
This configuration can meet customer requests.
Draft diagram: