Country: Bulgaria
Configuration:
20ft BESS container system Battery System 460kWh
Hybrid PCS 150kW
PCS 200kW
Solution: The project is a vehicle-mounted mobile energy storage system. It is used for new energy consumption in the data center to save electricity costs. The battery is charged by PV in place A, and moves to place B to discharge to the load. The customer has expanding requirements in the future, so we have reserved space for equipment and connection for cables.